Proven Results

Real deployments.
Measurable outcomes.

Every case below is drawn directly from our client portfolio. From a 4,500-person corporate facility to a 450-student school — the Pulserac model delivers cost predictability and Swiss-standard water quality across every sector.

38
% water saved
Wyndham Grand
90
% cost reduction
on bottled water
Zero
Capital expenditure
required
6
Enterprise
sectors served
100%
Budget certainty
all-inclusive
Corporate Facilities
Eagle Group International Ltd.
Hong Kong
Case 01 — Large Enterprise Facility

MDZN 500 deployed in 8 days — TDS from 380 ppm to 74 ppm

HKD $1.82M
Annual saving vs. bottled water
74 ppm
TDS — down from 380 ppm
87,000
Plastic bottles eliminated / yr

Challenge: Eagle Group's 4,500-person complex was spending HKD $2.4M per year on bottled water, with high-TDS (380 ppm) feed water creating compliance and hygiene reporting risks.

Solution: Pulserac deployed an MDZN 500 unit in 8 days under a Zero CAPEX service agreement. PDT disaggregates dissolved solids — no membranes, no chemicals — continuously monitored across 14 IoT parameters by the Hong Kong NOC, 24/7.

Result: TDS dropped from 380 ppm to 74 ppm, saving HKD $1.82M per year and eliminating 87,000 single-use plastic bottles — with water quality data feeding directly into Eagle Group's ESG reporting.

"The water quality data feeds directly into our hygiene management system — it's become a core part of our ESG reporting."

Facilities Director, Eagle Group International
F&B
Sing Kee Seafood Restaurant
Hong Kong
Case 02 — Restaurant & Food Service

12 locations — turbidity below 0.09 NTU, HKD $430K annual saving

HKD $430K
Annual saving across 12 locations
0.09 NTU
Turbidity — all sites
156,000
Plastic bottles eliminated / yr

Challenge: Sing Kee's 12-location F&B chain had no quality guarantee across sites — inconsistent water was affecting espresso extraction and beverage taste, while bottled water costs compounded to a significant annual overhead.

Solution: An MDZN 200 unit was deployed at each location within 10 days per site under Pulserac's Zero CAPEX, 3-year minimum SLA. PDT treatment brought turbidity below 0.09 NTU uniformly across all twelve outlets, backed by Swiss Federal FDWO certification.

Result: Total annual saving reached HKD $430K, with 156,000 plastic bottles eliminated and consistent sub-0.09 NTU water quality lifting espresso extraction and beverage presentation across all 12 sites.

"The difference in espresso extraction was immediate. Our baristas noticed it within the first shift."

Head of Operations, Sing Kee Restaurant Group
Hospitality
Wyndham Grand Hotel
Greater Bay Area
Case 03 — 5-Star Hospitality

MDZN 800 across 3 water loops — pH 7.1–7.4, 240,000 bottles eliminated

240,000
Plastic bottles eliminated / yr
$0.071/L
vs. $0.38/L bottled — 10× cheaper
pH 7.1–7.4
Across all 3 water loops

Challenge: Guest complaints over mineral taste and a bottled water cost of HKD $0.38/L across restaurant, banqueting, and in-room amenities were dragging OPEX at Wyndham Grand's 650-room property.

Solution: Pulserac installed MDZN 800 units across 3 separate water loops under a Zero CAPEX SLA. PDT maintains pH at 7.1–7.4 throughout all loops, monitored in real time across 14 IoT parameters via the Hong Kong NOC. HK WSD and Swiss Federal FDWO certified.

Result: Water cost fell from $0.38/L to $0.071/L — a 10× reduction — eliminating 240,000 plastic bottles annually and removing the in-room bottled amenity line to strengthen sustainability positioning with MICE and corporate clients.

"We eliminated the plastic bottle line from our in-room amenity budget entirely. The sustainability story plays well with our MICE clients."

Director of Operations, Wyndham Grand Hotel
Government & Travel
China Travel Service (HK) Ltd.
Hong Kong
Case 04 — Enterprise Travel & Hospitality Group

30+ properties — centralised NOC monitoring, 100% compliance across HK, Macau & GBA

30+
Properties on one NOC portal
100%
Q4 2023 lab sweep pass rate
24/7
Real-time NOC monitoring

Challenge: With 30+ properties across three regulatory jurisdictions — HK, Macau, and GBA — fragmented bottled water logistics and inconsistent compliance were escalating OPEX and operational complexity.

Solution: Pulserac deployed a fleet of MDZN 200–800 units scaled to each property under a unified Zero CAPEX agreement. All units stream 14 IoT parameters to Pulserac's centralised HK NOC, giving China Travel Service a single portal to monitor every property 24/7.

Result: A Q4 2023 independent laboratory sweep recorded a 100% pass rate across all 30+ properties, with 30 separate site-management tasks consolidated into one NOC dashboard.

"The centralised dashboard means our facilities team monitors 30 sites from one screen."

Group Facilities Manager, China Travel Service (HK) Ltd.
Education
Sai Kung Lee Shiu Kan Memorial School
Hong Kong
Case 05 — Primary School (800 Students)

MDZN 100 installed — bacterial load undetectable, heavy metals below WHO limits

800
Students protected daily
ND
Bacterial load — all tests
WHO
Heavy metals below detection

Challenge: Aging pipework raised lead contamination risk for 800 primary school students, with no mechanism to provide parents verifiable, ongoing water safety assurance beyond periodic third-party tests.

Solution: Pulserac installed an MDZN 100 unit under a Zero CAPEX agreement, treating all drinking water at point of use without chemicals or membrane replacement. Monthly independent laboratory reports are generated automatically under the SLA.

Result: Monthly lab results — validated by HKUST Guangzhou and Macau Institute — are published on the school's parent portal, with bacterial load at ND and heavy metals below WHO detection limits.

"Parents can check the water quality log on our parent portal. It's been a significant trust-building exercise."

Principal, Lee Shiu Kan Memorial School
Construction & Infrastructure
China State Construction Ltd.
Hong Kong
Case 06 — Construction Site & Worker Dormitory

MDZN 300 treating on-site source — 42,000 L/day for 2,200 workers, HKD $1.2M saved

42,000 L
Clean water delivered per day
HKD $1.2M
Annual logistics saving
2,200
Workers served on-site

Challenge: With no municipal supply, China State Construction was trucking in bottled water for 2,200 workers at HKD $1.2M per year — generating site delays and growing plastic waste ESG liability.

Solution: Pulserac deployed an MDZN 300 unit in 10 days, treating the on-site raw water source directly using PDT — no membranes, no chemicals. The unit delivers 42,000 litres per day at $0.071/L, continuously monitored via the Hong Kong NOC under a Zero CAPEX SLA.

Result: Eliminating the water truck contract saved HKD $1.2M per year; worker sick days dropped in Q1, and the project recorded zero plastic bottle waste from water provision.

"Eliminating the water truck contract alone justified the whole programme. Clean water on-site also reduced sick days in Q1."

Site Director, China State Construction Ltd.
Our Clients

Organisations that trust Pulserac.

Deployed across hospitality, F&B, corporate, construction, education, and government facilities — 1,000+ sites.

Hospitality
F&B
Corporate
Construction
Education
Government
Complimentary

Zero plastic.
Start with a free audit.

On-site visit. Full cost & ESG model. Delivered in 48 hours. Zero commitment.

✓ Zero upfront cost ✓ 10-day deployment ✓ 36K+ bottles/yr eliminated
Book Your Free Audit